ARIADNE can be adjusted based on organizational and or project needs by
using one of the ARIADNE methodologies (ARIADNE-PM or ARIADNE-SE) as the base of
the methodology that an organization desires tocrate. Figure 8 presents the building of a new
methodology using a standard ARIADNE methodology as the base, enhanced with
embedded process models from the other ARIADNE Methodology.
If for example, an organization develops primarily technology and information systems then the ARIADNE-SE Methodology will be used as the base methodology. On that base, the organization can add as many process models needed from the other methodology (ARIADNE-PM in this case) that will give the completeness in the methodology as the organization needs.